Lugnets Allé 7  

59.301841, 18.102036 (OpenStreetMap, Google Maps, Yandex Maps)

Figures over the ground floor
Number of briefcases

Historical background Checkpoint picture 64

The design for the speed tram chord that would connect Stockholm suburbs bypassing the city centre appeared in 1998. The first section Tvärbanan, which means “crossroad”, was opened in 2000 and then three more appeared. It is planned to complete construction of the remaining two sections in 2017. When creating this line, almost all possible ways of laying railroad across the city were used such as tunnels, elevated roads, dedicated and combined ways, local railways and a corridor with surface subway.

Present in routes of categories Griffin

Passed by: 4/5 (80%).

By categories:

  • Griffin: 4/5 (80%)